Day 144 of posting screenshots every day, of whatever I've been working on that day, until I run out of content or get bored
Alllllllllllrighty. So I played around for a little while, and came up with this as a support for the resource trunk line, running down the center of the building.
With that, I got all the rest of the belting and pipework built out.
Also, got all the rest of the power lines run.
So, with that, I figured it's time to power up and test everything. Which means I had to bring the main tubeway up to the building.
Also means I need to fill the Diluted Fuel loops with some canisters, so I went and harvested a bunch from the recycling facility.
Realized I needed pumps for all these Heavy Oil Residue lines.
Looks like everything is running now.
And with that, we're all set to move on to the final, primary manufacturing facility.
No replies yet